WEKA Release Lines
Plan upgrades by Release Line.
WEKA versions use the format Major.Minor.Revision. A Release Line is defined by the Major number, such as 4.x or 5.x. Revisions are cumulative within the same Release Line.
Support tiers define the lifecycle of a Release Line:
Current (N): Receives new features and service packs.
Maintenance (N-1): Receives service packs with bug fixes and currency updates.
Limited support (N-2): Receives selective fixes.
For lifecycle details, see Release support and commitments.
Version compatibility guidelines
Upgrade direction: Always upgrade from older to newer versions.
Release Line progression: Upgrade across consecutive supported Release Lines. If a multi-hop path is required, complete one Release Line at a time.
Compatibility basis: A target version supports upgrades from source versions whose fixes it already includes, within the supported source range for that target version. A service pack on an older Release Line can include fixes that reach the newer Release Line only in a later service pack. In that case, upgrade to the later service pack.
Client upgrades: Clients are supported if they are at most one Release Line behind the backend. In multi-hop upgrades, upgrade the clients before the cluster at each hop.
SCMC deployments: The
client-target-versionparameter must be identical across all clusters and compatible with the target backend version. See Mount filesystems from Single Client to Multiple Clusters (SCMC).Reference information: For exact supported source and target combinations, see the upgrade section at get.weka.io.
Check the upgrade path
Verify that the upgrade path from your source version to the target version is supported. The Upgrade Path checker on get.weka.io validates the path and indicates additional requirements, such as upgrading clients before the backends.

Procedure
On get.weka.io, open the Upgrade Path checker.
In the From box, select the source version.
In the To box, select the target version.
Select Check Path.
Review the upgrade summary:
Direct Upgrade indicates the path is supported.
2 Hops indicates that the upgrade requires two sequential upgrades.
A warning indicates an additional requirement to complete before the upgrade, such as a client upgrade.
The path list indicates the recommended target version.
Non-disruptive upgrade (NDU) overview
In MCB architecture, each container serves a single process type: drive, compute, or frontend. This allows a rolling upgrade, upgrading one container at a time, while the remaining containers continue serving clients.
Internal upgrade process
When you run the upgrade command, the following rolling sequence runs across all backend servers:
Download the target version and prepare all backend servers.
Rolling upgrade of the drive containers.
Rolling upgrade of the compute containers.
Rolling upgrade of the frontend and protocol containers (NFS, SMB, or S3), including those hosted on dedicated protocol servers.

Related topics
Before you begin
Complete these checks before running the starting the upgrade workflow.
Verify protocol separation. Assign only one of NFS, SMB, or S3 to each server. The upgrade does not start when a server runs multiple protocols. Contact the Customer Success Team to separate the protocols.
Verify the NFS protocol version. Contact the Customer Success Team if legacy NFS is configured. The upgrade is blocked until it is resolved.
Stop NFS file-locking services. On each server that runs the WEKA NFS service, stop and mask the
rpc-statdandrpc-statd-notifyservices. Masking prevents the services from starting again.Schedule S3 cluster creation. Create an S3 cluster only after the upgrade completes and all containers are running.
For clusters deployed with Data Catalog, clean up the data catalog index.
Disable the catalog indexing.
Remove the catalog cluster.
Delete the index filesystem.
Upgrade workflow
1. Verify system upgrade prerequisites
Use the WEKA Upgrade Checker Tool to validate system readiness before every upgrade, whether single-version or multi-hop. Running this procedure is mandatory.
Upgrade Checker results
Green
All prerequisites met
Verify the tool is the latest version
Yellow
Potential issues detected
Resolve before proceeding
Before you begin
Run the WEKA Upgrade Checker at least 24 hours before the scheduled upgrade.
Ensure passwordless SSH access is configured on all backend servers.
Procedure
Log in to one of the backend servers as a root user:
Access the server using the appropriate credentials.
Obtain the WEKA Upgrade Checker: Choose one of the following methods:
Method A: Direct download
Clone the WEKA Upgrade Checker GIT repository with the command:
git clone https://github.com/weka/tools.git
Method B: Update from existing tools repository
If you have previously downloaded the tools repository, navigate to the tools directory.
Run
git pullto update the tools repository with the latest enhancements. (The WEKA tools, including the WEKA Upgrade Checker, continuously evolve.)
Run the WEKA Upgrade Checker: Navigate to the
weka_upgrade_checkerdirectory. It includes a binary version and a Python script of the tool. A minimum of Python 3.8 is required if you run the Python script.Run the Python script:
python3.8 ./weka_upgrade_checker.py --target-version <version>
Or
Run the Python precompiled script:
./weka_upgrade_checker --target-version <version>
Replace
<version>with your target version. For example5.1.21. The tool scans the backend servers and verifies the upgrade prerequisites.Review the results:
Pay attention to the following indicators:
Green: Passed checks. Ensure the tool's version is the latest.
Yellow: Warnings that require attention and remedy.
Red: Failed checks. If any exist, do not proceed. Contact the Customer Success Team.
Send the log file to the Customer Success Team:
The
weka_upgrade_checker.logis located in the same directory where you ran the tool. Share the latest log file with the Customer Success Team for further analysis.
2. Prepare the cluster for upgrade
Use this method if the cluster environment includes a distribution server from which the target WEKA version can be downloaded.
If the distribution server contains the target WEKA version, run the following commands from the cluster backend server:
Where: <version> is the target WEKA version, for example: 5.1.21.
If the distribution server does not contain the target WEKA version, add the option --from to the command, and specify the get.weka.io distribution site, along with the token.
Example:
Use this method if the cluster environment has connectivity to get.weka.io.
From the Public Releases on the get.weka.io, select the required release.
Select the Install tab.
From the backend server, run the
curlcommand line as shown in the following example.

Use this method if the cluster environment does not have connectivity to get.weka.io, such as with private networks or dark sites.
Download the new version tar file to a location from which you copy it to a dedicated directory in the cluster backend server, and untar the file.
From the dedicated directory in the cluster backend server, run the
install.shcommand.

Download the target version to one of the backend servers using the method that matches your cluster's network environment.
Method A: Distribution server
Use this method if your environment includes a distribution server.
If the distribution server contains the target version:
If the distribution server does not contain the target version, pull it directly from get.weka.io using a token:
Method B: Direct download and install from get.weka.io
Use this method if the backend servers have direct connectivity to get.weka.io.
On get.weka.io, select the required release from Public Releases.
Select the Install tab.
From the backend server, run the
curlcommand displayed on the Install tab.
Method C: If the connectivity to get.weka.io is limited
Use this method if the backend servers have no connectivity to get.weka.io, such as in private networks or air-gapped environments.
Download the target version tar file and copy it to a dedicated directory on a backend server.
Extract the tar file and run:
./install.sh
3. Prepare the backend servers for upgrade (optional)
For large clusters, prepare the backend servers separately before running the upgrade to reduce total upgrade time. This step downloads the target version to all connected backend servers and readies it for installation.
Once the target version is downloaded to one of the backend servers, run:
Where:
<new-version>: Specify the new version. For example, 5.1.21.
4. Upgrade the backend servers
Run the following command on one of the backend servers to upgrade all cluster backend servers to the target version:
If you completed step 3, the command skips the download and preparation.
Before switching to the target version, the command distributes it to all servers and runs necessary preparations, such as compiling the wekafs driver. If a server disconnects or a driver fails to build, the upgrade stops and identifies the problematic server.
Additional options
Resume after a failure in the drives phase
--ndu-drives-phase
Resume after a failure in the frontends phase
--ndu-frontends-phase
Resume after a failure in the computes phase
--ndu-computes-phase
Upgrade process container uses a non-default port (default: 14000)
--mgmt-port <port>
5. Verify LLQ and WC are enabled in AWS
LLQ (Low Latency Queue) reduces I/O operation delays in AWS and is enabled by default after an upgrade. However, LLQ requires Write Combining (WC) to be active in the igb_uio driver. After upgrading the backend servers, verify that WC is enabled.
Procedure
Check for upgrade events on the backends. If
NetDevDriverReloadFailedappears, restart the WEKA service on each affected backend server:
Verify that WC is activated:
An output of 1 confirms WC is active and LLQ is functional.
6. Upgrade the clients
Manage client upgrades to ensure software alignment with the backend clusters. The client upgrade is an online process that does not require unmounting filesystems. You can trigger the client upgrade remotely from the backends while the clients remain active.
Client upgrade types
Learn the available methods for upgrading clients to the target version.
Upgrade: Allows clients to remain mounted and operational throughout the client software update.
Local (on-client) trigger: An administrative action performed from the client itself to perform upgrade.
Remote trigger: An administrative action performed from the backend servers to trigger upgrades on specific client(s).
Remount-based upgrade: An alternative method where a client automatically upgrades following a remount of all mounted wekafs on a client or reboot.
Persistent client coordination: A dedicated client acting as a protocol gateway manages containers with
allow-protocols true. During upgrades, it coordinates with backend servers to maintain continuous protocol service availability.Multi-cluster clients: Perform online upgrades locally for clients without unmounting filesystems. Related topic: Mount filesystems from Single Client to Multiple Clusters (SCMC).
Upgrade a client locally
Update the software of a single stateless or persistent client by connecting directly to the server. You can perform this as an online upgrade without unmounting filesystems.
Before you begin
Upgrade all backend components to the target version.
Verify version compatibility in the Version compatibility guidelines.
Procedure
Download the target version package from a backend server to the client.
Update the agent software.
Upgrade the client containers. For a client connected to a single cluster, run:
For a client connected to multiple clusters, upgrade all containers simultaneously:
Version management flags
Reference these flags for the weka version command to manage package downloads and visibility.
--client-only
Downloads only the essential components required for stateless client operations.
--full
Displays version information only when the complete set of components is present on the server.
Upgrade clients in batches (via remote trigger)
Use the backend servers to remotely trigger online upgrades for multiple stateless or persistent clients. This method ensures clients stay mounted while the software updates.
Before you begin
Identify the client IDs for the target group.
Ensure the backend servers are running the target version.
Procedure
Run the remote upgrade command from a backend container.
Remote upgrade parameters
Reference the following table for parameters used with the weka local run upgrade command.
--mode=clients-upgrade
Activates the remote upgrade process for clients.
N/A
--client-rolling-batch-size
Defines the number of clients to upgrade in each sequential batch.
1
--clients-to-upgrade
Specifies a comma-separated list of client IDs to include.
All clients
--drop-host
Specifies a comma-separated list of client IDs to exclude from the upgrade.
None
Example
The following command upgrades two clients in two sequential batches, with each batch containing one client:
7. Complete the cluster upgrade
Verify the upgraded cluster and restore Data Catalog services when required.
Verify that the cluster runs the target version.
For clusters deployed with Data Catalog, create the catalog cluster and index filesystem. Follow Deploy the catalog services.